Access the Full Project by Clicking here!
Bidjugde
JOB
WWTP Improvements
BID DATE
11/12/18 - 2:00
AGENCY
Quartzsite
ESTIMATE
n/a
SCOPE
Quartzsite WWTP Improvements including, but not limited to Site Grading; Installation of new Influent Pumps, new complete headworks system with fine screening, Flow Equalization Basin (FEB) bypass line, new FEB pumps; Conversion of the existing Sequencing Batch Reactor (SBR) into two SBRs; Process pipe modification to the existing Sludge Pump Station; Construction of new sludge drying beds and process piping; HDPE lining of the SBR basins; Waterproofing and concrete repair of the FEB and Sludge Aerobic Digester; Process pipe modification to the existing chlorination and de-chlorination equipment; Installation of a new onsite reuse pump station, process piping and appurtenances; Conversion of the aerobic digester to temporary SBR; Modification to the existing MCC and PLC; Replacement of existing electrical conductors/ wiring to existing equipment and process; Modification of the existing MCC building; Construction of the new prefabricated metal blower building, including lighting, ventilation, and electrical; Installation of aeration blowers and process piping, etc. Andrea Jaycox ajaycox@pacewater.com
PREBID
10/24/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT