Watermain CIP FY18 19
BID DATE
10/25/18 - 2:00
AGENCY
Vallejo
ESTIMATE
$900,000
SCOPE
The work to be done includes: Furnishing and Installation of the following: approximately four thousand seven hundred fifty-four (4,754) lineal feet of 8-inch PVC; thirteen (13) 8- inch gate valves; seven (7) fire hydrant assemblies; two (2) zone valve assemblies; one hundred twenty-two (122) 1-inch new water service lateral installations; including tie-ins, sixty (60) lineal feet of house supply line, water main tie-ins, miscellaneous fittings, paving, and all other work and facilities necessary victor.gonzalez@cityofvallejo.net
PREBID
10/18/2018 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT