AZ FLAP 237 Mormon Lake Road
BID DATE
11/28/18 - 2:00
AGENCY
Department Transportation
ESTIMATE
$15,000,000
SCOPE
PRESOLICITATION ONLY, NOT BIDDING YET: The Mormon Lake Road project is 9.8 miles long and consists of widening the existing roadway to a consistent paved width of 34 feet. The existing roadway has 12 foot lanes and 0-2 feet of shoulders. The proposed project would widen the road to accommodate two 12 foot lanes and two 5 foot shoulders. Through the town of Mormon Lake, the proposed paved width would be two 11 foot lanes and two 4 foot shoulders within the existing disturbed road prism. Culverts will need to be widened along the route. Line Item Unit Est. Quantity Roadway Exc CUYD 60,000 Minor Drainage LNFT 500 Aggregate Base TON 20,0 00 Hot-asphalt concrete paveme nt TON 35,000 Anticipated solicitation date will be late October. Anticipated Construction Duration: January 2019 - October 2019 Primary Point of Contact.: Eric Grosskreuz, Contract Specialist CFLcontrats@dot.gov Secondary Point of Contact: Ryan Phillips, Contract Specialist CFLAcquisitions@dot.gov
UPDATES