Pipeline Rehabilitation AU 1
BID DATE
11/6/18 - 2:00
AGENCY
San Diego
ESTIMATE
$3,920,000
SCOPE
Rehabilitation of approximately 38,237 LF (7.24 miles) of existing 8-inch vitrified clay (VC) and concrete pipe (CP) sewer mains. In addition, all existing sewer laterals will be rehabilitated from the property line to the sewer mains and assessed by CCTV. The project also includes point repair, manhole rehabilitation, manhole repair, manhole replacement, cleanout installation, manholes, curb ramp installation, alley apron, street resurfacing and continental crosswalks. Scope includes preparation of D sized engineered traffic control plans by a registered engineer. All required approvals and associated permits for traffic control is the responsibility of the contractor. See bid item 45. Additionally, E & O insurance is required. See section 7-3.10. Ron McMinn - 619-533-4618 rmcminn@sandiego.gov