Access the Full Project by Clicking here!
Bidjugde
JOB
Marine Avenue Improvement
BID DATE
10/25/18 - 11:00
AGENCY
Manhattan Beach
ESTIMATE
$1,230,400
SCOPE
Reconstruction of PCC curb access ramps to ADA standards at designated locations: cold mill, cold-in-place recycling (CIPR), and asphalt rubber hot mix (ARHM) overlay, reconfiguration of crosswalk and curb ramp access on the south sides of the Peck Avenue & Herrin Avenue intersection; re-establishment of disturbed and impacted traffic striping, traffic signal detector loops, hand-holes, pavement markings, sign, utility covers (manholes, vaults, meters) etc.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT