Monrovia Renewal North Section Infrastructure Improvements
BID DATE
11/14/18 - 2:00
AGENCY
Monrovia
ESTIMATE
$11,243,172
SCOPE
The Project Includes:Demolition of: asphalt pavement, pulverization of pavement, saw cut concrete and asphalt, removal of: concrete curb and gutter, sidewalk, driveways, cross gutter, curb ramps, concrete retaining walls, pedestrian culvert walls, AC pavement, and cold mill of AC pavement Removal of: roofing, insect screen, sand blasting, existing epoxy sealant, wrought iron fence, chain link fence, and existing landscaping. Construction of: AC pavement, micro surfacing, mill and fill ac pavement, concrete curb and gutter, sidewalk, drive approach, curb ramp, cross gutter, longitudinal gutter, transitional curb, and parkway drain, adjust utilities, adjust manholes, local depressions, manholes, manhole pipe to pipe, sewer bypass and dewatering/pumping, grinding asphalt paving, installation of: 1”, 1½”, water services, and abandoning existing water services, pre and post CCTV, inspection of sewer pipe lines, removing and replacing sewer line sections and wyes, installation of lateral connections, lateral reinstatement, CIPP lining of sewer lines, CIPP point and/or sectional repair of sewer lines, top hats, reconnect of sewer service laterals internally, manhole base repair/replacement, water mains and water services, hot taps, ductile iron pipe, roofing, wrought iron fencing, insect screen, epoxy injection and crack sealing, epoxy sealer, landscape planting and Irrigation, utility conduits and vaults, traffic control, SWPPP, erosion control, pedestrian and vehicular access, and public notification, mobilization, demobilization, bond and insurance.
UPDATES