Access the Full Project by Clicking here!
Bidjugde
JOB
Canal Screen Facility
BID DATE
10/24/18 - 10:00
AGENCY
Contra Costa WD
ESTIMATE
n/a
SCOPE
The Work includes grading of the Contra Costa Canal (Canal) access road and shoulder (including offhauling excess material) and hydroseeding of new slope face; constructing a concrete pads and a walled containment area; constructing a walkway platform over the Canal anchored to existing concrete abutments; furnishing and installing security fencing, gates, and guardrails; installing horizontal and inclined conveyors furnished by International Water Screens; furnishing and installing spray system pump, piping, hoses, fittings, and other appurtenances; removing an owner-furnished automated screen and support frame from current location at MP 25.02, transporting from MP 25.02 to MP 23.25, and installing at MP 23.25; furnishing and installing electrical system to power new components at the site; demolishing existing disconnects, wire, conduit, and weatherhead on existing utility pole and removing existing wire from disconnects to existing loads; furnishing and installing new wire, conduit, and weatherhead on existing utility pole and new wire between existing loads and new breakers in new lighting panel; furnishing and installing instrumentation and control system including local control panel, level sensor, and conduit and wire.
PREBID
10/9/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT