Michelson Water Recycling Plant Emergency Recycled Water Diversion San Diego Creek
BID DATE
11/29/18 - 2:00
AGENCY
Irvine Ranch WD
ESTIMATE
$830,000
SCOPE
The project includes, but is not limited to, installation of 24-inch epoxy lined and coated welded steel pipe, isolation valves, flow meter, static mixer, pressure reducing valve, connections to existing plant pipelines at two separate locations, construction and installation of a chemical containment structure, chemical storage tank, bisulfite metering pump system, and associated electrical and instrumentation improvements.