Access the Full Project by Clicking here!
Bidjugde
JOB
Cove Stormwater Pump Station Upgrades
BID DATE
10/25/18 - 2:00
AGENCY
Marin County
ESTIMATE
$1,853,410
SCOPE
The proposed Project involves upgrading an existing storm water pump station. Work shall include, but is not limited to, installing new pumps and motors to increase pumping capacity to 21,100 gpm; modifying the existing pump bays and wetwell; installing an onsite generator with diesel fuel pod and automatic transfer switch; installing a trash rack; installing a new motor control center; electric and structural upgrades; replacement of the existing programmable logic controller and Operator Interface Terminal; adding wetwell access hatches; providing redundant water level sensors and associated controls consisting of a primary electronic or pressure type sensor and a mechanical-type backup; installing protective fence around generator; replacement of existing 36” corrugated metal pipe (CMP) connected to the wetwell with 48” reinforced concrete pipe (RCP); replacement of existing 18” CMP connected to the wetwell with 18” RCP, installing new storm drain manholes, installing 15” RCP, installing a SCADA system and autodialer, providing temporary bypass pumping, demolition, and construction of a new wooden pump house. Scott McMorrow, smcmorrow@marincounty.org
PREBID
10/3/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT