Access the Full Project by Clicking here!
Bidjugde
JOB
2017 18 Annual Street Overlay
BID DATE
10/11/18 - 3:30
AGENCY
Rialto
ESTIMATE
$3,200,000
SCOPE
The Work comprises the furnishing all materials, equipment, tools, labor and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed hereunder consist of traffic control; implementation and maintenance of Best Management Practices SWPPP; construction staking and monument perpetuation; removal and replacement of PCC curb ramps, curbs, gutters, cross-gutters, driveways, and sidewalks; cold milling; crack sealing; full depth AC reconstruction; asphalt concrete base course; asphalt rubber hot mix (ARHM) surface course; and adjustment of surface utilities to grade. The work also includes traffic striping and pavement markings, replacement of affected traffic signal detector loops, and all associated work as identified on the construction drawings. Jeffrey Schafer - 909-820-2531 jschafer@rialtoca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT