Access the Full Project by Clicking here!
Bidjugde
JOB
Vallecitos Water District 11 Vista Irrigation District 12 Flow Control Facility
BID DATE
09/28/18 - 2:00
AGENCY
Vallecitos WD
ESTIMATE
$4,800,000
SCOPE
Relocation of utilities; excavation, shoring, forming and pouring concrete; general site grading, paving, retaining wall construction, and fence installation; construction of a concrete masonry unit (CMU) building; rehabilitation of valve vaults and existing two 20-inch diameter steel pipe outlets; installation of bulkheads, blind flanges, new 12- to 24-inch pipe, elbows, valves, flow meters, roof hatches, stairs, shop-fabricated metal building, and other mechanical and electrical equipment; pressure testing and connection to existing facilities. Removal of existing concrete structures. Installation of landscaping and irrigation lines. Mike Vanoli Assistant Management Analyst mvanoli@sdcwa.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT