Access the Full Project by Clicking here!
Bidjugde
JOB
Street Improvement Del Mar Avenue Phase 2A
BID DATE
09/27/18 - 3:00
AGENCY
San Gabriel
ESTIMATE
n/a
SCOPE
The scope of work includes, but is not limited to the following: excavation and hauling of existing asphalt concrete and base material, removal of existing sidewalk, non-ADA curb ramp, spandrel, cross gutter, driveway, curb and gutter, construction of aggregate base and asphalt concrete (AC), construction of PCC Curb and gutter, PCC sidewalk, ADA curb ramp, PCC Spandrel, PCC cross gutter, PCC driveway approach, adjusting utility valve box and cover to grade, adjusting manhole frame and cover to grade, furnishing and installing blue reflective pavement marker adjacent to fire hydrants, adjustment of survey monuments and ties, furnishing and installing pavement striping, markings and markers, furnishing and installing traffic loop detector, and other incidental and appurtenant work necessary for the proper construction of the contemplated improvements as indicated on the maps, sketches and spreadsheets contained within the specifications. The scope of work shall include all labor, materials and equipment necessary to complete the project as outlined herein and on the plans. Greg Ripperger, PE CIVILTEC engineering inc. 118 W. Lime Ave, Monrovia, CA 91016 626.357.0588 gripperger@civiltec.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT