JOB
FY 17 18 Pavement Rehabilitation
BID DATE
10/11/18 - 3:00
AGENCY
Goleta
ESTIMATE
n/a
SCOPE
The work includes all labor, material and equipment necessary to pulverizing and processing existing paving section, Hot Mix Asphalt (HMA) paving, full depth reclamation (FDR), striping, traffic control, remove and replace concrete sidewalk, driveway, spandrel/cross gutter, root pruning, and installation of access ramps on designated streets within the City of Goleta, CA. The contract period is 71 Working Days.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT