Access the Full Project by Clicking here!
Bidjugde
JOB
Airport Road Storm Damage Repair
BID DATE
09/21/18 - 2:00
AGENCY
El Dorado County
ESTIMATE
$347,000
SCOPE
The Work to be performed includes tree removal, slide debris removal including fallen trees, clearing and grubbing, culvert excavation, removal of an existing 18" corrugated metal pipe under Airport Road, installation of a new 18” reinforced concrete pipe, installation of underdrain system and permeable material, structure backfill, installation of rock slope protection, roadway excavation, installation of drainage inlet, installation of rolled erosion control product, placement of a new structural section, asphalt dike, asphalt paving for roadway and gutter, and striping work. The roadway will be closed for the duration of this Project with a detour in place. Other items or details not mentioned above, that are required by the Contract Plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed, constructed or installed. Brian.Franklin@edcgov.us
PREBID
9/13/2018 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT