Toltec Buttes Road Florence Casa Grande Canal Bridge Repair
BID DATE
10/2/18 - 1:30
AGENCY
Casa Grande
ESTIMATE
$30,000
SCOPE
The project generally consists of the removal and repair of the pier wall. The work is located on Toltec-Buttes Road between Selma Hwy and Grogan Ave. The existing bridge is a two-span reinforced concrete slab bridge. Plans of the existing bridge are not available. The bridge shall be design per AASHTO LRFD Bridge Design Specifications, 8th edition, and Arizona Department of Transportation (ADOT) Standard Specifications for Road and bridge construction, 2008 and Special Provisions. cityclerk@casagrandeaz.gov