JOB
Talavera Water Main Replacement Phase 2
BID DATE
10/25/18 - 2:00
AGENCY
Coachella Valley Water District
ESTIMATE
$6,500,000
SCOPE
The Talavera Water Main Replacement, Phase 2 Project consist of installing the following: 2,243 LF of 18-inch diameter Zinc-Coated DIP w/V-Bio Polywrap 3,425 LF of 12-inch diameter Zinc-Coated DIP w/V-Bio Polywrap 11,969 LF of 8-inch diameter Zinc-Coated DIP w/V-Bio Polywrap 250 – 1-inch water services with new meter box 7- 2-inch water servicesAbandon in place existing Ductile Iron Pipeline by means of Pressure Grouting. Remove existing valves and hydrants and return them to CVWD Yard as directed. Mario Zamora - 760-398-2651 x2273 mzamora@cvwd.org