Access the Full Project by Clicking here!
Bidjugde
JOB
Point Sal Access Road Repairs Phase 1 Culvert Repairs Phase 2
BID DATE
09/12/18 - 3:00
AGENCY
Santa Barbara
ESTIMATE
$300,000
SCOPE
PHASE 1: The road repair project consists of the excavation and replacement of approximately 25 vertical feet of the existing roadway, replacement of the existing 6’ diameter metal culvert and headwalls with a longer and larger (7’ diameter) culvert and metal headwalls. The rebuilt slopes include three 18” diameter down drains to help reduce future erosion. PHASE 2: The culvert repair project is located approximately 1,500 feet northwest from the Phase 1 project site on the Point Sal Trail road and repairs a failed 18” diameter metal culvert approximately 1,500 feet southwest of the Phase 1 site on the Point Sal Trail road. The project consists of removal of the existing culvert and replacement with a concrete headwall, 18” diameter HDPE pipe and down drain, with rock rip rap at the outfall. The project includes slope restoration and roadway repairs, AC pavement and guard rail construction. Jill Van Wie City of Santa Barbara 630 Garden St Santa Barbara, CA 93101 Tel:(805) 897-1981 Fax:(805) 897-2681 jvanwie@co.santa-barbara.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT