Access the Full Project by Clicking here!
Bidjugde
JOB
Baseline Rd Improvements Val Vista Dr Roadway Improvements
BID DATE
09/13/18 - 3:00 LIVE!
AGENCY
Mesa
ESTIMATE
$5,000,000
SCOPE
Plan Set ‘A’: Approximately 0.90 mile of roadway improvements on Baseline Road from 24th Street to the Consolidated Canal, including mill & overlay with cold in-place recycled base course (Base Bid), or full conventional hot mix asphalt concrete reconstruction (Bid Alternate No. 1); construction of new raised medians, street lighting, landscaping, traffic signals, segments of new 36-inch storm drain and 12-inch water main, and appurtenant work. Engineer’s Estimate range is $3.60 to $3.90 million. Plan Set ‘B’: Approximately 0.50 mile of roadway reconstruction improvements on Val Vista Drive from Baseline Road to US60 including mill & overlay and PCCP, including the addition of a 3rd northbound lane starting at Baseline Road for approximately 600 feet, with associated landscape, irrigation, and traffic signal improvements. There will be a relocation of an existing 4” gas line and installation of a gas regulator station with SCADA system. Engineer’s Estimate range is $1.05 to $1.15 million. maggie.smith@mesaaz.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT