Access the Full Project by Clicking here!
Bidjugde
JOB
Pacific Sidewalk Phase 3
BID DATE
09/11/18 - 2:00
AGENCY
Monterey
ESTIMATE
$187,000
SCOPE
In general, the work consists of replacement of existing D.G. sidewalk with concrete sidewalk, and reconstruction of concrete driveway crossings with ADA- compliant driveway crossings. The work shall include, but not be limited to, demolition and construction of concrete curbs, gutters, sidewalks, sidewalk crossings, driveways, Hot Mix Asphalt paving, paver driveway conforms, signage, and striping. krebs@monterey.org
PREBID
8/28/2018 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT