Access the Full Project by Clicking here!
Bidjugde
JOB
Martin Luther King Jr Library ADA Parking Lot Improvements
BID DATE
09/5/18 - 2:00
AGENCY
Sacramento
ESTIMATE
$103,000
SCOPE
A. Work covered under this contract (PHASE ONE) is composed of construction and repair of the entrance patio, walkway, and accessible parking improvements at Martin Luther King Jr. Library; in conformity with construction documents contained herein, including all labor, materials, tools, accessories,equipment, and incidentals required, complete, and ready to use.B. The work consists of demolition of the existing asphaltic (AC) disabledparking spaces and the concrete walkway and pavement. Upgrade with concrete construction. Remove wood spacers between the exposed concrete pavement at the entry patio. Fill joints with cementitious material.Curb ramps. Parking striping and signage. Cast in place truncated dome.C. ALTERNATE: Remove and Replace the existing exposed aggregate concrete pavement at the entry patio. Kirsten Wise - 916-808-4011 KWise@cityofsacramento.org
PREBID
8/21/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT