Northwest Somerton Drainage Improvements Phase I
BID DATE
11/1/13 - 1:30
AGENCY
Yuma County
ESTIMATE
n/a
SCOPE
The City of Somerton is expected to begin a roadway improvement project along Spring Street between Cesar Chavez Avenue and Union Street on June 20, 2014. Thus, the Contractor shall complete Spring Street improvements by June 15, 2014. Unless the District notifies the Contractor otherwise in writing, pavement and striping shall not be replaced along Spring Street except at the parking lot and driveway at 404 West Spring Street (Assessor Parcel Number 743- 62-116). Instead the Contractor shall backfill pipe to existing grade, set manhole frames and covers to existing grade, construct temporary pipe plugs at catch basin stub-outs (NPI), and create and maintain access, traffic control, and a driveable (surfaced with ABC or millings), dust free surface along Spring Street until June 15, 2014.