Access the Full Project by Clicking here!
Bidjugde
JOB
Shattuck Reconfiguration Pedestrian Safety
BID DATE
09/11/18 - 2:00
AGENCY
Berkeley
ESTIMATE
$7,200,000
SCOPE
The work of the project is divided into two parts: Base Bid (Part A work) and Bid Alternate (Part B work). The work to be performed under these specifications generally includes but is not limited to: development of a construction phasing plan and traffic control plans; rehabilitation of asphalt concrete pavements; installation of Portland cement concrete pavement; construction of sidewalk, curb and gutter, and roadway medians; reconstruction of curb ramps, demolition and removal of concrete sidewalk, curb, and gutter; installation of temporary and permanent traffic signals and/or lighting; landscaping; drainage improvements; installation of thermoplastic pavement markings; installation of traffic signs; and traffic control. Bidders are hereby advised that the work in the Shattuck Avenue business district requires adherence to strict construction phasing and traffic control requirements to allow public access at all times. Bidders are strongly advised to visit the project site prior to bidding. kjung@cityofberkeley.info
PREBID
8/21/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT