Pala Sewer Force Main
BID DATE
09/27/18 - 10:00
AGENCY
Eastern Municipal WD
ESTIMATE
$3,500,000
SCOPE
The work comprises construction of 24-inch sewer force main pipeline, 18-inch sewer force main pipeline, and appurtenances in accordance with the Contract Drawings and Specification, performing wet tap existing 18-inch force main pipeline and installation of line-stops and temporary bypass systems for new force mains to be connected to existing force mains, performing disposal of removed sewer flow from existing sewer pipeline and groundwater if encountered during construction, perform earthwork for retaining wall construction, performing jack/bore installations, trench sheeting, shoring and bracing per California Labor Code, import of required backfill material, pavement removal, replacement and restoration per encroachment permits, hydro-static testing, miscellaneous testing, coordination regarding pipeline connections and field start-up and testing, preparation of SWPPP and implement required BMPs during construction, preparing traffic control plans and performing traffic control during construction per the City of Temecula’s encroachment permit conditions, obtaining encroachment permit from the City of Temecula, Riverside County Flood Control, as well as all other miscellaneous items as shown on the Contract Drawings and Specifications. pillowb@emwd.org lis@emwd.org
UPDATES