Access the Full Project by Clicking here!
Bidjugde
JOB
Wildcat Hill Wastewater Treatment Plant Temporary Digested Solids Dewatering System
BID DATE
10/14/13 - 3:00
AGENCY
Flagstaff
ESTIMATE
$1,500,000
SCOPE
The Work consists of construction of a temporary digested sludge solids dewatering and polymer injection system including a laydown area (approximately 220-feet by 265-feet) for the placement of the 60-foot circumference by 160-foot long geotextile fabric dewatering bags (Geotubes®). The laydown area will generally consist of grading within the location for the future SSB III, installing a geogrid or geotechnical fabric, placing and compacting a 12-inch aggregate subbase, and installation of a 4- inch asphaltic cement running surface for trucks or earthmoving machinery, repair and reconstruction of existing improvements affected by the Work, and incidentals for a complete and usable facility.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT