Access the Full Project by Clicking here!
Bidjugde
JOB
Mill Overlay 800 East 450 South 900 South
BID DATE
08/10/18 - 4:30
AGENCY
Springville
ESTIMATE
n/a
SCOPE
Edge mill and overlay of 800 East from approx. 450 South to 900 South from lip of gutter to lip of gutter. Work shall include a 2-inch edge mill, (min 8-foot wide and 2-inches below the existing lip of gutter) along the perimeter of the project limits, and placement of a 2-inch overlay over the milled area and remaining roadway portion. The project will also include the lowering, raising and collaring of existing manholes and water valves in the project area and the restriping of the newly overlaid roadway. Fax: (801) 489-2709

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT