Access the Full Project by Clicking here!
Bidjugde
JOB
Coachline Blvd Reconstruction
BID DATE
08/29/18 - 3:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
Coachline Boulevard reconstruction project entails the restoration of pavement on Coachline Blvd. and Colony Park Dr. and the intersection at Continental Reserve Loop. Coachline and Colony Park consist of milling of existing pavement, cement treated subgrade, placement of a rubberized chip seal interlayer and replacement of PAG 2 residential mix. Install ADA ramps, utility adjustments, and concrete flatwork. Continental Reserve Intersection shall be reconstructing the median, and re-paving for proper drainage, and striping. Rudy Torres (520) 382-1983 rtorres@maranaaz.gov
UPDATES