Access the Full Project by Clicking here!
Bidjugde
JOB
Hillcrest Storm Drain
BID DATE
08/23/18 - 2:00
AGENCY
Prescott
ESTIMATE
n/a
SCOPE
The Hillcrest Storm Drain project includes the improvements to roadway and drainage features at Hillcrest Lane, Bloom Place and the adjacent unnamed alley. These improvements include replacement of the existing pavement, addition of pavement, vertical curb, valley gutter and storm drain system which will outfall into the proposed by others storm drain system within Robinson Drive. The project also includes removal and replacement of the 2-inch water main in the alley area servicing two of the residences. jeff.low@prescott-az.gov
PREBID
8/14/2018 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT