Access the Full Project by Clicking here!
Bidjugde
JOB
Tracy Recycled Water Transmission Mains WWTP Pump Station
BID DATE
08/28/18 - 2:00
AGENCY
Tracy
ESTIMATE
n/a
SCOPE
The base bid includes approximately 1,168 linear feet of 30-inch diameter ductile iron pipeline from the proposed recycled water pump station within the wastewater treatment plant (WWTP) to the fence on the western side of theWWTP. From this point the recycled water pipeline continues along Holly Drive and ends near the intersection of Lammers Road and Grant Line Road. This portion of the Project is more specifically defined in thePlans and Specifications, but generally includes the following work to be done: Installation of approximately 4,754 linear feet of 30-inch diameter recycled water pipeline, and approximately 17,434 linear feet of 24-inch diameter recycled water pipeline, across agricultural fields and unimproved land within City-owned property and in City and San Joaquin County roads. Approximately 8,104 linear feet of pipeline will be concrete slurry encased. The project also includes: dewatering of pipe trenches; one (1) bore and jack pipe installation; pipeline appurtenances; cathodic protection; access manways; pavement grinding, overlay, and microsurfacing slurry seal. The Project includes a pipeline turnout, including a pressure reducing valve, backflow preventer, blow offs, butterfly valves, sampling stations, flowmeter and relocation of an existing 8-inch diameter potable water line http://qap.questcdn.com/qap/projects/prj_browse/ipp_browse_grid.html?group=4201841&provider=4201841
PREBID
8/7/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT