Access the Full Project by Clicking here!
Bidjugde
JOB
Sycamore Trail Bryte Avenue Enhanced Bicycle Route
BID DATE
08/2/18 - 2:00
AGENCY
West Sacramento
ESTIMATE
$806,000
SCOPE
The proposed work consists of realigning Sycamore bicycle and pedestrian trail, slurry sealing, placing decomposed granite shoulder, remove and replace existing driveways with ADA curb ramps, installation of reflex bollards and trash cans, installation, removal, and replacement of signs and posts including a solar rectangular rapid flashing beacon, placing pavement striping and markings, as well as installation of landscaping and irrigation utilities and pedestrian overhead lighting and conduits. The proposed work is located at the existing utility corridor east of Maple Street between West Capitol Avenue and Rice Avenue (Project Area #1). Additional improvements include placing pavement markings and installation of signs and posts in various locations between Sunset Avenue and 5th Street (Project Area #2) as shown on the plans. ryant@cityofwestsacramento.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT