Access the Full Project by Clicking here!
Bidjugde
JOB
Adaman Well No 3 Transmission Main
BID DATE
08/15/18 - 3:00
AGENCY
Goodyear
ESTIMATE
$1,800,000
SCOPE
Adaman Well No. 3 is located at the southeast corner of the Loop 303 and Bethany Home Road. The well is drilled, and the City of Goodyear plans to have the site equipped by summer 2019. In order for the well to enter into the raw water transmission system to deliver water to Site 21, a new section of transmission main must be constructed. This new transmission main will begin at the northeast corner of Adaman Well No. 3, continue east on Bethany Home Road to Sarival Boulevard (Blvd), turn south on Sarival Blvd and terminate at the connection to the existing 30-inch transmission main on Sarival Blvd at the Missouri Avenue alignment. Victoria.jackson@goodyearaz.gov
UPDATES