Access the Full Project by Clicking here!
Bidjugde
JOB
Resurfacing 50 North Oakwood Drive
BID DATE
08/1/18 - 2:45
AGENCY
North Salt Lake
ESTIMATE
n/a
SCOPE
The work to be performed consists of furnishing all labor, tools, materials, equipment, transportation, and services required for the construction of the above described project as included in the Contract Documents; consisting of the following items of work: remove existing asphalt; partial reconstruction of areas identified during construction; pre-lower existing manholes and water valves; install approximately 2,125 SY of new asphalt; replace manhole and water valve collars; and reinstall existing survey monuments; all in accordance with the Drawings and Specifications prepared by the North Salt Lake City Engineering Department.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT