Access the Full Project by Clicking here!
Bidjugde
JOB
Reach I Contract 1
BID DATE
07/21/18 - 1:00
AGENCY
Department Army
ESTIMATE
$25,000,000
SCOPE
The Natomas Basin Reach I Contract 1 is located on the reach of Natomas levee adjacent to the American River in Sacramento, California. Reach I Contract 1 includes installation of approximately two miles of cement-bentonite cutoff walls between Gateway Oaks Boulevard and Northgate Boulevard, mostly centered on Garden Highway. The cutoff walls will have an average depth of 45 feet. Excavation spoils will be hauled to a site identified herein to be spread and compacted. A landside drainage blanket will be installed on the levee slope underneath Interstate 5. Relocation and/or removal of waterlines, sanitary force mains, and other utilities will be included in this contract. Multiple lane closures, road closures, and bicycle trail closures are also included, requiring traffic control, detours, and signage for both vehicles and pedestrian/bicyclists. Repaving and striping of roads and trails is also included. The prime contractor shall self-perform 100 percent of the cutoff wall effort.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT