Access the Full Project by Clicking here!
Bidjugde
JOB
North Shore Beach Water Reclamation Plant No 2 Improvements
BID DATE
08/29/18 - 2:00
AGENCY
Coachella Valley Water District
ESTIMATE
$2,400,000
SCOPE
The project scope consists of all related activities for the demolition, mechanical, structural, electrical, and instrumentation and Controls for the construction of the North Shore Beach Water Reclamation Plant No.2 Improvements for CVWDs Water Reclamation Plant Nos. 2 and 4. The general scope of work includes the following:Demolition, removal and disposal of the existing Oxidation Pond No. 2 and Pond No. 1-C liner, filter fabric, aerator, aerator anchors, conductors and appurtenances in WRP Nos.2 and 4.Demolition, removal and disposal of the existing diesel generator, diesel storage tank, conductors and appurtenances.Demolition, removal and disposal of the existing MCC-1 service meter, breakers, ATS, conduits, conductors and appurtenances in Electrical Control Building.Cut and remove the above grade structure of existing activated sludge plant, irrigation pump structure, tertiary sand filter, and sludge bed pump to the grade level. All existing equipment including, but not be limited to, pumps, blowers, piping, supports, valves, diffusers, gates, stairs, lightings, panels, and electrical appurtenances shall be removed from both above and below grade structures. Nasrin Maleki - 760-398-2651 x2342 nmaleki@cvwd.org
UPDATES