Eastmark Phase XII Roadway Improvements
BID DATE
08/23/18 - 2:00 LIVE!
AGENCY
Mesa
ESTIMATE
$3,300,000
SCOPE
ALTERNATES: dcs alt 1 $22,640 alt 2 $398,395 redpoint $22,340 alt $242,154 South Eastmark Parkway (S883) – The Project consists of approximately 3,105 linear feet of half street surface improvements with landscape installed on the east side of the road and within the raised median. The street improvements include one lane in each direction connecting into the existing improvements of South Eastmark Parkway at the south end of the project. Surface improvements include concrete curb and gutter, sidewalk, paving, striping, signage, street lights, street sleeves, entry monuments, landscaping and irrigation. Underground utility improvements include 8-inch sewer, 12-inch sewer, 20-inch potable water (with pipe bonding cathodic protection and isolation flange kits), cathodic protection test stations, 8-inch to 36-inch storm drain, and non-city dry utilities. Stephanie.Gishey@mesaaz.gov
UPDATES