Citywide Signalized Intersection ADA Upgrades Phase 2
BID DATE
08/14/18 - 2:00
AGENCY
Monterey
ESTIMATE
n/a
SCOPE
In general, the work consists of, but is not limited to, reconstruction of seven intersections, construction of drainage improvements, striping and signage, and traffic signal and street lighting work. This work shall include, but not be limited to, demolition of existing pavement and curb, gutter, and sidewalk, construction of catch basins, installation of storm drain pipe, manholes, construction of curb and gutter, sidewalk, HMA and PCC paving, HMA overlay, striping and signage, and traffic signal and street lighting improvements. Regina Trinque City of Monterey 601 Wave Street Ste 100 Monterey, CA 93940 Tel:(831) 242-8749 Fax:(831) 646-5686 trinque@monterey.org
PREBID
7/10/2018 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT