Access the Full Project by Clicking here!
Bidjugde
JOB
Rehabilitation Parkridge Dr Skyline Blvd Denton Ct Sanitary Sewer Pump Stations
BID DATE
08/9/18 - 2:00
AGENCY
Oakland
ESTIMATE
$1,094,375
SCOPE
The proposed work consists, in general, of removing and replacing equipment, demolishing existing equipment and structures, rehabilitating existing structures, and installing new equipment at three (3) sewage lift stations. Equipment to be replaced and installed include various pumps, piping, valves, electrical equipment, one (1) standby engine generator, and other items shown to be constructed on the contract drawings or specifications, including repair, and reconstruction of existing improvements affected by the Work, and incidentals for complete and usable facility, and other work specifically shown in the project documents. A pre-project meeting is scheduled for Jul 17, 2018 - 10:00 am David Ng at 510-238-7267, dng@oaklandnet.com
UPDATES