Westside Storm Drain Phase 3
BID DATE
01/30/19 - 11:00
AGENCY
Long Beach
ESTIMATE
$2,827,482
SCOPE
The Work to be done consists primarily of constructing Reinforced Concrete Box (RCB) and Reinforced Concrete Pipe (RCP) storm drain conduit and appurtenances; constructing new catch basins and local depressions; and doing all necessary excavation and grading. Additionally, small water line relocations will be required to go over or under the proposed storm drain and a portion of the SD-03 pump station liner will be reconstructed. Bids are required for the entire Work. George Ker, Project Manager / Laura Doyle, Analyst George.Ker@longbeach.gov / Laura.Doyle@longbeach.gov