Access the Full Project by Clicking here!
Bidjugde
JOB
Nephi Culinary Water Improvements 2018
BID DATE
07/17/18 - 10:00
AGENCY
Nephi
ESTIMATE
n/a
SCOPE
Approximately 25 miles of 6”—16” municipal pipelines and associated valves and fittings, Two 1,500,000 concrete water storage tanks with associated 24’ inlet and 30” outlet piping, modifications to and interior painting of the existing 2,500,000 steel water storage tank, one new spring head box for the power station, one new spring collection box, one masonry chlorination building, two concrete well buildings, approximately 150 fire hydrants, approximately 400 service connections and/or reconnections, all to be completed in accordance with Specifications prepared by Sunrise Engineering, Inc. and the Utah Rules for Public Drinking Water Systems jiverson@sunrise-eng.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT