Access the Full Project by Clicking here!
Bidjugde
JOB
Redondo Beach Transit Center
BID DATE
07/19/18 - 11:00
AGENCY
Redondo Beach
ESTIMATE
$6,000,000
SCOPE
Task 1. Redondo Beach Transit Center Redondo Beach Transit Center – This task includes Federal funding and must be kept administratively separate from the second task for payment purposes. The task includes a certified LEED Silver New Transit Center with bus bays, passenger waiting area and information center, driver operator lounge, offices, automated ticket machine, public and private restrooms, bicycle facilities, and parking lot. Please note Design Build items on cover of drawing, contractor to provide separate permit package for each, including geotechnical report for shoring. Previous geotechnical reports are for reference only. It is the City’s requirement to obtain a Temporary Certificate of Occupancy as soon as possible to move existing Galleria Transit Center operations to the New Transit Center. LEED Silver for the Transit Center Building is a requirement of the Federal funding sources. Specific LEED credits may be changed with the City’s approval if the Contractor is not able to obtain those specific credits. LEED Silver must be obtained, and fees for obtaining LEED Silver shall be included in the bid. See proposed LEED credits in the bid package. Task 2. Kingsdale Avenue Street Widening Kingsdale Avenue Street Widening – This task does not include Federal funding and must be kept administratively separate from the first task for payment purposes. This task requires demolition of the existing Galleria Transit Center, and widening Kingsdale Avenue adjacent to its location. Work includes signaling, curb and gutter installation, striping, landscaping, street lighting, grading, relocation of storm drain, paving removal and replacement. This phase of the work will take place after the New Transit Center has Temporary Certificate of Occupancy and is operational. RedondoEngineering@Redondo.org
UPDATES