Pacific Coast Highway Torrance Boulevard Northbound Right Turn Lane
BID DATE
08/1/18 - 10:00
AGENCY
Redondo Beach
ESTIMATE
$320,000
SCOPE
Work for this right turn lane addition project includes: remove and re-construct existing AC pavement; construct new AC pavement with base and sub-base; remove and re-construct curb & gutter, and curb ramp per approved plans, Caltrans Standard and specification; remove and re-construct PCC sidewalk, cross gutter, catch basins, storm drains and bus pad. 2. Work also includes: remove and reconstruct traffic signal pull boxes; remove and reconstruct signal poles, pedestrian push button, countdown ped heads, luminaires, mast arms, conduits, loop detectors and sign post; signing and striping; relocate street lighting poles; provide traffic control, utility coordination and any other work required per plans and specifications. RedondoEngineering@Redondo.org
PREBID
7/10/2018 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION