Access the Full Project by Clicking here!
Bidjugde
JOB
2017 18 Great Streets Improvement Phase 1
BID DATE
08/2/18 - 3:00
AGENCY
San Gabriel
ESTIMATE
$1,800,000
SCOPE
The scope of work includes, but is not limited to the following: milling, excavation and hauling of existing asphalt concrete and base material, removal of existing sidewalk, parkway planter, non-ADA curb ramp, spandrel, cross gutter, driveway, curb only, curb and gutter, curb and gutter in front of the curb ramp and driveway, construction of cement stabilized pulverized base (CSPB) and asphalt concrete (AC), construction of PCC curb, PCC Curb and gutter, PCC sidewalk, ADA curb ramp, parkway planter, PCC curb and gutter in front of new curb ramp, new parkway planter and existing driveway, PCC curb and gutter, PCC Spandrel, PCC cross gutter, PCC driveway approach, adjusting water valve box and cover to grade, adjusting electric vault manhole frame and cover to grade, adjusting manhole frame and cover to grade, furnishing and installing blue reflective pavement marker adjacent to fire hydrants, adjustment of survey monuments and ties, furnishing and installing pavement striping, markings and markers, furnishing and installing traffic loop detector, relocating existing sign, and other incidental and appurtenant work necessary for the proper construction of the contemplated improvements as indicated on the maps, sketches and spreadsheets contained within the specifications. The scope of work shall include all labor, materials and equipment necessary to complete the project as outlined herein and on the plans

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT