JOB
Storm Damage Repair 2018 FEMA
BID DATE
07/13/18 - 2:00
AGENCY
Solano County
ESTIMATE
$967,000
SCOPE
Gates Canyon Road: furnish an Ultrablock retaining wall in existing slip area adjacent to the traveled roadway. Reconstruct roadway. Install temporary road closure and relocate existing barrier rail on site. Install cross-culvert. Cantelow Road: Rock slope protection with RSP fabric adjacent to the roadway in down slope slip-out to re-establish the hillside and reconstruct, install paved roadway shoulder. Install HMA dike and cross-culvert. Paint traffic stripes. Steiger Hill Road: furnish and install two Ultrablock retaining walls in existing slip areas between the traveled roadway and waterway. Reconstruct roadway. Maintain permanent closure and salvage existing barrier rail on site. Paint traffic stripes. mrtuggle@solanocounty.com