Access the Full Project by Clicking here!
Bidjugde
JOB
Eastmark Phase II Roadway Improvements
BID DATE
09/19/13 - 2:00 LIVE!
AGENCY
Mesa
ESTIMATE
n/a
SCOPE
A Mandatory Pre-Bid Conference will be held Wednesday, August 28, 2013 at 1:00 p.m. in the Upper Level Council Chambers at 57 E. First Street, Mesa, Arizona. a. S. Eastmark Parkway (S834) – consists of about 2,110 linear feet of full street improvements. The improvements include potable water, storm drain system, dry utilities, concrete curb, gutter and sidewalk, paving, striping, signage, street lights, traffic signal conduit systems in preparation for traffic signal at Point Twenty-Two Blvd, street sleeves, neighborhood entries, landscaping and irrigation. b. S. Everton Terrace (S835) - consists of about 1,756 linear feet of full street improvements (two lanes), including sewer, potable water, storm drain, dry utilities, concrete curb, gutter and sidewalk, paving, street lights, street sleeves, neighborhood entries, landscaping and irrigation. c. E. Point Twenty-Two Blvd (S836) - consists of about 5,960 linear feet of half street improvements (two lanes each direction divided minor arterial with median ) including potable water, small portion of well line, storm drain system, dry utilities, concrete curb, gutter and sidewalk, paving, striping, signage, street lights, traffic signal at Signal Butte Road, street sleeves, neighborhood entries landscaping and irrigation. d. S. Signal Butte Road (S837) – Phase II improvements; consists of about 2,150 linear feet of construction for half street improvements (two lanes one direction with a middle turning lane in lieu of a m

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT