Access the Full Project by Clicking here!
Bidjugde
JOB
Clearfield City 1425 West Street Roadway Improvement
BID DATE
07/10/18 - 2:30
AGENCY
Clearfield
ESTIMATE
n/a
SCOPE
The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above project; consisting of the following items of work: mobilization; obtaining all bonds and insurance; removal and disposal of concrete curb and gutter, sidewalk, flatwork, trees, roadbase and asphalt roadway materials; furnish and install approximately 1,290 feet of 8-inch pvc C-900 DR-18 culinary water pipe, fire hydrants, culinary water services and meter improvements; furnish and install approximately 130 feet of 15-inch RCP storm drain pipe and storm water catch boxes; furnish and install new curb and gutter, sidewalk, handicap ramps, waterways, flat work, roadbase and asphalt roadway surfacing and all appurtenant work in accordance with the Drawings and Specifications prepared by the Engineer, CEC, Civil Engineering Consultants, PLLC. Wendy Page +801 (525) 2707 wendy.page@clearfieldcity.org Todd Freeman +801 (866) 0550 todd0468@gmail.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT