La Cholla Blvd Phase II Overton Rd Tangerine Rd Watermain Replacements
BID DATE
08/27/18 - 10:00
AGENCY
Oro Valley
ESTIMATE
n/a
SCOPE
The project is located in the Town of Oro Valley on La Cholla Boulevard, from Overton Road to Tangerine Road. The project limits are from north of the intersection of La Cholla Blvd. and Overton Rd. to south of the intersection of La Cholla Blvd. and Tangerine Rd. The project consists of reconstruction of three traffic signal at the intersections of La Cholla Blvd. with Lambert Ln., Naranja Dr., and Glover Rd. with signalized and marked pedestrian crossings; widening to four lanes including raised landscaped median, curbs, multi-use path, and sidewalk; and construction of drainage facilities. The work includes furnishing all labor, materials, and equipment necessary to reconstruct the traffic signals, and to construct all conduit, median cuts, ADA-compliant curb access ramps, striping, signing, and utility coordination. A pre-bid conference is scheduled for 1:30 PM, Wednesday, July 18, 2018 at the Hopi Room, Public Works Building, Town Hall, 11000 North La Cañada Drive, Oro Valley, Arizona 85737. Mark Neihart (520) 229-4722 mneihart@orovalleyaz.gov
UPDATES