Reconstruct Taxiway D Shoulders Connectors
BID DATE
07/17/18 - 2:00
AGENCY
Tucson Airport Authority
ESTIMATE
n/a
SCOPE
Taxiway D is a 75-foot X 5,957-foot asphalt taxiway with structural and erosion control pavement and serves as the parallel taxiway to Runway 3-21. The pavements are showing signs of fatigue since original construction in 2000 and require rehabilitation to extend its useful life. Major elements include the mill and overlay of Taxiway D, D1, and D3, Taxiway fillet geometry improvements, realignment of TW D2, and relocation of runway hold position markings and associated airport lighting and signage, relocation of Taxiway D service road. Project includes airport marking and re-striping. The project consists of rehabilitating the full length of Taxiway D and connector Taxiways D1 and D3. Reconstruction of the existing 25-foot wide structural shoulders and removing 25-foot erosion control pavement on the outboard edge of the shoulders. The rehabilitation of the mainline structural pavements will consist of a 3.5-inch mill and overlay. In addition, Taxiway D2 will be demolished and realigned as a conventional 90-degree taxiway between Runway 3-21 and Taxiway D. ryan.toner@dibblecorp.com
UPDATES