Access the Full Project by Clicking here!
Bidjugde
JOB
Sky Ranch Pipeline Repair
BID DATE
06/28/18 - 4:00
AGENCY
Washington County Water Conservancy District
ESTIMATE
n/a
SCOPE
The project consists of installation of approximately 1,000 lineal feet of 8” PVC and the replacement of 1,000 lineal feet of HDPE pipe to ductile iron pipe with associated fittings. The project is located adjacent to Sand Hollow Reservoir, approximately 10 miles northeast of St. George, Utah. Copies of the contract documents and specifications may be examined and/or obtained after June 18, 2018 at the office of Alpha Engineering, 43 South 100 East, Suite 100, St. George, Utah, 84770, 435.628.6500. All bidders are required to purchase a set of the contract documents from Alpha Engineering – printed copies are $75, electronic files (PDF via email or on a compact disc) are $35. Fees are nonrefundable. www.wcwcd.org/business-growth/reps-bids brie@wcwcd.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT