Access the Full Project by Clicking here!
Bidjugde
JOB
Sierra Pines Roadway Reconstruction Phase II
BID DATE
08/14/13 - 2:05 REAL-TIME
AGENCY
Show Low
ESTIMATE
n/a
SCOPE
The work is generally described as follows: Reconstruction of approximately 11,400 LF of existing roadway known as South Alpine Drive, West Serra Buena Court, South Canyon Ridge Trail, South Ridgecrest Drive, South Knoll Trail, West Aspin Trail, South Snow Creek Court, South Serra Pines Circle, and portions of South Elk Run Drive and West Sierra Pines Drive. The reconstruction of these roadways is located in the Sierra Pines Subdivision in Show Low, Arizona. Work includes, but not necessarily limited to, the milling of existing asphalt roadway, recycle and mixing existing asphalt millings into existing base, subgrade preparation and compaction, reshaping the roadway grade, lowering water valves boxes before reconstruction and re-adjust water valve boxes to finish grade, install new asphalt pavement overlay, re-establish roadway shoulder, and other items necessary for the accomplishment of the improvement. The work also includes, but is not limited to, utility coordination, traffic control, and erosion control. The work includes all required labor, materials, equipment, transportation, incidentals and services for the project to complete a usable and operable facility in accordance with all pertinent codes and regulations as necessary to complete the job in a workmanlike manner as shown on the Construction and Bid Documents.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT