Citywide Stormdrain Rehab (REBID)
BID DATE
09/27/18 - 2:00
AGENCY
Encinitas
ESTIMATE
$214,020
SCOPE
ORG BID RESULTS: LNR Engineering Construction - $209,395 DVBE ASAP, Inc - $235,538 Burtech Pipeline Inc. - $263,985 The work consists of the rehabilitation and repair of existing storm drains within the City of Encinitas that are badly corroded. Work includes point repairs, Cured in Place Pipe Liners (CIPP), HDPE Solid Wall Pipe Liners, and other miscellaneous items of work as called out in the project specifications. Work to be completed within 40 working days. A map of the locations of the storm drains to be worked on and a table containing the Facility ID and additional information for each drain is included as Appendix A to the specifications. Matt Widelski- 760-633-2862 mwidelski@encinitasca.gov