Access the Full Project by Clicking here!
Bidjugde
JOB
9th St. and Hall Intersection Improvements
BID DATE
08/6/13 - 2:00
AGENCY
Show Low
ESTIMATE
n/a
SCOPE
The work includes, but is not necessarily limited to the removal and disposal of existing asphalt, concrete, drainage structures, and excavation material. The work also includes but is not necessarily limited to the installation of concrete curb and gutter, sidewalk, ADA ramps, precast concrete pavers, drainage pipe and drainage structures required by the installation of the proposed improvements, the installation of irrigation conduit for landscaping, electric conduit, electric pull boxes, adjusting water/sewer boxes, roadway subgrade preparation, and the installation of new asphalt concrete. The work also includes, but is not limited to, utility coordination, traffic control, and erosion control. An Additive Alternate 1 to the project is to continue to construct improvements to the intersection of North 9th Street and East Hall. This work includes, but is not necessarily limited to the removal and disposal of existing asphalt, concrete, and excavation material and to install concrete curb and gutter, sidewalk, roadway subgrade preparation, installation of asphalt concrete, electric conduit, and electric pull boxes. The work also includes, but is not limited to, utility coordination, traffic control, and erosion control.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT